Jan. 10th, 2004

treeskin: (Default)
No socking to report yesterday. Did get the body finished on the Lopi sweater, the sleeves joined to it, and the first 5 rnds of the yoke done. And, I remembered to try on the body before I joined the sleeves--much better fit this time. Still don't like colorwork at this gauge.

The Sweater is 1 1/2" deep now, still in the corrugated ribbing. Still don't like corrugated ribbing, but the end is in sight. Texture is lovely already--this fabric is still dense, but being so wide, it's much more flexible than in the socks. Still on gauge, too. Woo hoo.

Brought the Greco-Turkish socks to work today, to weave in ends. (Must find lucet so I can do the cords for these.) And a couple skeins of sock yarn, since I don't know what I'll be in the mood for later.

Profile

treeskin: (Default)
treeskin

April 2017

S M T W T F S
      1
2345 678
9101112131415
16171819202122
23242526272829
30      

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags