Furter addendum to the weekend update
Oct. 11th, 2005 08:34 amKnitting, this time.
Am two skeins/12" (or thereabouts) into the peacock plumes vest for myself. Am very pleased with the progress.
Tried the kilt hose on T again, found that my current increase scheme is working, so I can progress on those again. Must rip the second sock out 3" and redo all that, but it'll work better if I do.
Must spend this weekend finishing baby stuff. They're both due the second week of Nov.
Am two skeins/12" (or thereabouts) into the peacock plumes vest for myself. Am very pleased with the progress.
Tried the kilt hose on T again, found that my current increase scheme is working, so I can progress on those again. Must rip the second sock out 3" and redo all that, but it'll work better if I do.
Must spend this weekend finishing baby stuff. They're both due the second week of Nov.