Chugging along
Aug. 5th, 2003 06:49 amDidn't get as much knitting done on the tied-up tee as I'd hoped to. That afternoon nap kinda slowed me down. But I got the first sleeve 1 1/2" from the sleeve cap, and I'm halfway there on the second sleeve. The sleeves are a bit slower--I just couldn't figure out a graceful way to work them in the round, and sitll work around the split at the bottom of the sleeve, so I'm working the sleeves in rows. Bah, humbug. I've got one skein left for the kit, and I'll need it to do the sleeve caps for both sleeves, and then I'll need enough to do the neck edging. *crosses fingers*
I'd really like to have this done today. Maybe even go back to the aran sandal sock and finish it too. Must knit faster.
I'd really like to have this done today. Maybe even go back to the aran sandal sock and finish it too. Must knit faster.